The new office building seen from the park

The Lab · Design

Private Campus

A renovated office campus in Elsbethen, Salzburg, designed to blend in with its surroundings using camouflage, growing in stages to 2,000 workplaces around a garden of the future.

TYPE

Office

LOCATION

Elsbethen, Salzburg

CAPACITY

2,000 workplaces

TEAM

Francisco Herrero, Rafael Garcia-Monge, Gabriel Muñoz, Raoul Skrein

Closing the Ring

The existing staff buildings surround the main square on three sides. To avoid long walks between departments, the new offices take the fourth side and close the ring. Housing and support programs sit outside the ring, each where its surroundings suit it, and the showrooms face the main entrance. The old stables and chapel are in poor condition and block any growth of the site; the stables give way to the new building, and their rubble is recycled into its concrete.
Fig. 01

Closing the ring

The new building closes the office ring around the main square, with the park restaurant to the south and the showroom pavilion by the main entrance.

The park restaurant: the park and its trees flow through the building.

Fig. 02

Growing to full capacity

Each stage works on its own, and the second can be split into as many steps as needed. The municipality caps the campus at 2,000 workplaces.

  1. Stage IAn office and lab building for 250, the reception and a showroom pavilion, 40 micro flats, 12 staff flats, 10 rental flats, and workshops with a service yard.
  2. Stage IIOffices and labs for 550 more, 20 more micro flats, 55 rental flats, and an underground garage with 400 spaces.
  3. Full capacityThe last part of the office ring, 7 more micro flats and 10 more rental flats.
Camouflage

The site was a military base, and its buildings were camouflaged to deceive the enemy. The project keeps only that idea and turns it into an urban tool: the art of blending into the surroundings. A campus for up to 2,000 people in the middle of a well-known residential district needs exactly that.
‍
The office takes the height and form of the existing barracks, and a minimalist facade of reflection and transparency blurs its edges, between disguise and disclosure. The larger housing blocks are split into smaller volumes, so apartment buildings read as houses. The showroom is half hidden in the park: from outside it is hard to tell what lies beneath.
Fig. 03

The office building

It follows the footprint of the old stables, so the old trees stay. It rises to four floors and steps down where needed to keep the views to the Hohensalzburg Fortress and the Untersberg; to the south it opens onto the protected horse pond.

Section through the office building and the park.

Fig. 04

Flexibility becomes construction

The cores sit on the south side, which deepens the facade and shades the floors, and frees two full 8.5 m modules for any layout.

400 m² a daybuilt by five workers and a crane, weather-tight at once, with minimal disruption to the office
50 workplacesthe step in which the office can grow (580 m²), during design or in a later phase
10%reserve in every area for spontaneous densification
  1. WorkplaceRoom for each person to adapt their own space.
  2. TeamRoom for collaboration and change within teams.
  3. NeighbourhoodRoom to absorb any change between teams.
  4. FloorRoom for growth in the future.
Fig. 05

Sustainability

A low-carbon building, from its materials to how it is run.

Materials

Regional timber
Structure, floors, ceilings and furniture from regional, sustainably managed forests. One cubic metre of timber stores about 960 kg of CO₂.
Recycled concrete
Up to 62.5% of the concrete for foundations and cores comes from the rubble of the old stables.
Recycled aluminium
The facade is recycled aluminium; its reflection counters the urban heat-island effect.
Lighter foundations
The light structure cuts foundations by up to 30%.

Operation

Solar roof
Next-generation photovoltaics on the whole roof; waste heat warms the water.
Natural shading
Terraces in front of the facade shade it, so blinds that block the view are rarely needed.
Fresh air
Displacement ventilation, with sensor-controlled natural ventilation.
Smart lighting
Sensor-controlled lighting at the desks saves up to 40% of the energy.
Inside

On the ground floor, the side facing the park becomes a main street joining the main entrance to the restaurant, with a small reception at the foot of each core for every 200 people. The park restaurant lets the park and its trees flow through the building: on grey Salzburg days and in winter, it is the one place on the campus to recharge in nature. Timber interiors keep the workplace warm, and the raised floors look across the park to the fortress.